Cached route

South Extension to Jhandewalan metro route

Fastest route from the seeded station graph with 2 interchange.

Stops

9

Depart

06:19

Arrive

06:47

Duration 28m
Distance 10.8 km
First train 05:45
Last train 23:00

Journey timeline

Route details

  1. South Extension

    Pink Line · 06:19

  2. INA

    Change to Yellow Line , towards Samaypur Badli .

    Interchange 5 min
    • Jor Bagh
    • Lok Kalyan Marg
    • Udyog Bhawan
    • Central Secretariat
    • Patel Chowk
  3. Rajiv Chowk

    Change to Blue Line , towards Dwarka Sector 21 .

    Interchange 5 min
    • RK Ashram Marg
  4. Jhandewalan

    Arrive 06:47

Entry gates

South Extension

  • Gate information coming soon

Exit gates

Jhandewalan

  • Gate information coming soon

Route summary

Fastest cached route

Start at South Extension at 06:19. The journey covers 10.8 km in 28m, reaches Jhandewalan at 06:47, and uses 2 interchange.

Cost comparison

Metro, auto and cab for 1-4 passengers

Mode 1 passenger 2 passengers 3 passengers 4 passengers
Metro Lowest ₹30 ₹60 ₹90 ₹120
Auto ₹420 ₹420 ₹420 ₹840
Cab ₹680 ₹680 ₹680 ₹680

Trip impact

Compared with a typical cab ride

CO2 saved

1.6 kg

Fuel saved

0.7 L

Time saved

25 min

Calories

90 kcal

FAQ

Common questions

The token fare is Rs 30, or Rs 27 with a smart card.
It takes about 28m, covering 10.8 km.
This route has 2 interchange at the stations shown in the timeline.
Yes. The route above is computed from the seeded metro graph and cached on first request.